This month has seen a lot of behind the scenes preparation work. More pipe and fittings were purchased for the next winding session. Now there are piles of pipe and fittings by size for easier assembly. I also worked on restoring a spreader and wiring it in between the shade frames. This spreader will connect the swell shades and tremulants.
Finally, the largest project of the month was to make and install batten strips for the swell shades. By design, the shades have small cracks between the individual shades. In a theatre, this isn’t a big issue. In a house, every little bit of sound deadening helps. The strips are made from poplar and have a channel cut in them that was inlaid with felt. The strips are fastened to the edge of each blade with the felt portion covering the cracks. Thanks to Zach Frame for letting me burn through a router table bit of his and to my assistant Ella for sanding/painting and Charlotte for holding up the other end of each strip, which made mounting them that much easier!
0 Comments
|
The BlogCheck out this page for project updates! Archives
August 2024
Categories |