This past month has been consumed with hanging drywall and wiring the pedalboard. At the time of writing this article, all drywall has been hung and doors installed. The wire wrapping tool made quick work out of wiring the contact rail for the pedalboard, which is now complete.
The other focus was to cut down the swell shades to fit into the opening in the wall between the chamber and tone chute. Because of the opening dimensions, it made more sense to have the shades open horizontally, rather than vertically. Special thanks to Zach Frame for assisting me with cutting these down. Let’s just say Wurlitzer didn’t intend for these to shrink in size….what a pain! After hauling the frames back into our basement, a quick test fit was performed (see photo). Please note that the lovely maroon color that exists from the previous installation in the Theatre Guild will be refinished!