This month has seen a lot of progress with the blower room. The drywall, painting and electrical are complete! With an LED equivalent of 400 watts of lighting, a work light shouldn’t be necessary. For safety, a red “emergency stop” button was installed on the outside of the blower room. If something happens, one just needs to hit the button to stop the blowers.
On the other end of the house, the one shiny Chrysoglott bar bothered me enough to pull the entire assembly out. Now they all look shiny and have new felts and surgical tubing installed. Finally, static winding to the main and solo trunks have been completed. Two additional “helpers” found themselves in the chamber with me. With their “touch everything in sight” nature, I found that placing them in the wind trunk kept them from getting into too much trouble!